
The Mandemaat project in Assen combines architecture with building technology to create a future-proof building
As an ultra-modern, sustainable office building, the Mandemaat project in Assen is considered one of the most sustainable government buildings in the Netherlands. OBO Bettermann enhanced the structure with its products, including from the area of cable support systems.

Robust cable infrastructure for a next-generation data centre
OBO provided the entire cable infrastructure for the AMS4 data centre in Diemen Proven products created a solid foundation for the data centre, where the focus is on reliability and continuity.

Renovation of a conference room in the heart of Kyiv
Event spaces, in particular, rely on offering different power supply options. OBO Bettermann provides a design-oriented solution, along with practical products.

New ETZ Elisabeth Hospital building in Tilburg
A large-scale new building is being constructed for Elisabeth-TweeSteden Hospital (ETZ) in Tilburg, the Netherlands, as an extension to the existing hospital complex.

A villa that couldn’t be any closer to nature
The height-adjustable stainless steel cassettes from OBO Bettermann blend seamlessly into the flooring, offering a flexible power supply throughout the entire house – exactly where it’s needed.

UniElektro PV system in Mittenwalde – a specialised solution without ballasting
OBO developed and implemented a specialised solution for the UniElektro central warehouse based on UniBase Glue – a ballast-free hybrid system comprised of Magic PV Flat Basic combined with UniBase Glue, which was bonded to the roof cladding without penetrating the roof.

Hong Kong-Zhuhai-Macao Bridge – the longest sea bridge in the world
The Hong Kong-Zhuhai-Macau Bridge is considered a symbol of China's unity. OBO Bettermann system solutions were also used in this mega-project.

The silhouette of the new building resembles the design of an Italian sports car
JB Motors is known for outstanding exclusivity, now reflected in the construction costing around three million euros, offering the perfect backdrop for luxury cars.

The most state-of-the-art data centre in Germany – OBO Bettermann ensures secure data transmission
This trendsetting data centre, called dataR, offers a wide range of possibilities. The building is scheduled for completion by 2026 at the latest.

Braunschweig – renovation of the Lindenberg bus depot
Thanks to the extensive experience and expertise of OBO employees, the new building was designed and equipped in accordance with lightning protection class 1.